84
      Saturday
      85 / 63
      Sunday
      89 / 65
      Monday
      89 / 67

      Syracuse roadwork information for this week

      The City of Syracuse has released the following road closures and detours for the week of June 30 to July 5th. You can find a map with the detours by clicking the following link: Syracuse Roadwork

      Erie Blvd. West Bridge over Onondaga Creek: There is a full closure of Erie Blvd West between Plum Street and Franklin Street . The West Street ramp up to Erie Blvd West will remain open. Here is the detour- Eastbound from Erie Blvd: south to West Street via ramp, east on Fayette Street, north on Salina Street, west on Genesee Street, south on Clinton Street, west to Erie Blvd.

      Westbound from Erie Blvd: south on Franklin Street, west on Washington Street, north on West Street, ramp to Erie Blvd.

      Connective Corridor on West Fayette Street: The detour will be for westbound traffic on Fayette Street at South Salina Street. Here is the detour- north to Washington Street, west to Franklin Street, south to Walton Street and continue to West Fayette Street.

      Eastbound traffic will be maintained throughout.

      Connective Corridor East Project: The detour will be for westbound traffic on East Genesee Street between Almond Street and McBride Street. Westbound traffic will be detoured at Almond St. south to Harrison St, west to State St. and north back to East Genesee St intersection.

      Eastbound traffic will be maintained throughout.

      Connective Corridor East Genesee Project: This project will detour westbound traffic on East Genesee Street between Townsend Street and State Street. Westbound traffic will be detoured at Townsend St. north to Fayette St., west to State St. and south back to East Genesee St intersection.

      Eastbound traffic will be maintained throughout.

      Connective Corridor East Genesee/Almond Project: This project will be limited to a single lane closure of eastbound traffic on East Genesee Street between Almond Street and Forman Avenue.

      One eastbound lane will remain open during this work.

      West Street: This project will include lane reductions on the northbound lanes of West Street between W. Fayette St. and W. Onondaga St.

      Southbound traffic will be maintained throughout due to NYSDOT work on 690.

      Oneida Street: This project will detour traffic on Oneida Street between Adams Street and Temple Street. The southbound detour will follow east on Adams St., south on S. Clinton St., and west on Taylor St. back to Oneida St.

      The northbound detour will follow east on Taylor St., north on S. Clinton St., and west on Adams St. back to Oneida.

      Westcott Street: This project will include a road closure on Westcott Street between Dell Street and South Beech Street.

      Traffic will be detour around the block via Dell street and South Beech Street.

      Midland Avenue: This project will include a road closure on Midland Avenue bridge over Onondaga Creek. Pedestrian access on the bridge will be maintained.

      Tthe southbound vehicular detour is: Midland east on Tallman, south on Cortland back to Midland.

      The northbound vehicular detour is: Midland north on Cortland, west on Tallman, back to Midland.

      East Fayette Street: This project will include block by block street closures between Westmoreland Avenue and Genesee Park Drive. Traffic will be advised to detour around the block.

      West Genesee Street: This City led project will include a full street closure with detours. Westbound traffic on West Genesee St. will be detoured, north on State Fair Blvd., west on Hiawatha Blvd., north on Erie Blvd., and south on W. Fayette St. back to West Genesee St.

      Eastbound traffic will be detoured south on W. Fayette St., and north on Geddes St., back to West Genesee St. Erie Blvd West traffic will follow the same detours.